Go to Hassocks Hog 1 diary
Go to Hassocks Hog 3 diary

October 2008
10 Oct (Last year recap)
10 Oct (Left idler shaft)
June 2007 (retired Hog 2?)
April 2007 (Gas tap flap)
August 2005 (IAR sponsorship)
July 2005 (school outings)
June 2005
1 Jun (MC repair revisited)
May 2005
18 May (Controller repair)
November 2004
14 Nov (lighter bearings)
October 2004
18 Oct (current brick)
30 Oct (unbent flipper)
July 2004
8 Jul (current limiter)
May 2004
1 May (mounting brackets)
6 May (new front panel)
8 May (Portsmouth event)
28 May (protected MOSFETs)
February 2004
5 Feb (radio interference)
15 Feb (after Brighton)
January 2004
3 Jan (bottle spanner)
10 Jan (motor magnets)
18 Jan (pink panels)
December 2003
20 dec (melted connector)
29 dec (gas tap mod)
November 2003
2 nov (status LEDs)
9 nov (straight dip tube)
12 nov (Appearance money)
October 2003
4 oct (better pneumatics)
...4 oct (chassis repairs)
6 oct (new pneumatics)
8 oct (straight flipper)
18 oct (5/3 valve removed)
28 oct (faster pneumatics)
...28 oct (better hinge)
August 2003
2 aug (panels painted)
8 aug (flipper clamp)
9 aug (clamp finished)
10 aug (Hog's face)
16 aug (dead battery)
20 aug (another fault)
July 2003
6 jul (armour fitting)
13 jul (Campion event)
20 jul (painted chassis )
June 2003
12 jun (new trailer)
21 jun (plastic sheets)
22 jun (carrying cradle)
25 jun (RW phone call)
27 jun (bending plastic)
May 2003
3 may (test drive)
7 may (sprocket pins)
18 may (chains jump off)
24 may (better tensioner)
31 may (smaller batteries)
Apr 2003
5 apr (mc test)
6 apr (software update)
...6 apr (22 MOSFETs blow)
9 apr (MOSFETs replaced)
10 apr (dimpled shafts)
12 apr (MOSFETs working)
17 apr (gas reg arrives)
19 apr (Hog 1 flips Hog 2)
20 apr (whiplash effect)
27 apr (co2 bottle in place)
Mar 2003
6 mar (upper chassis)
9 mar (flipper design)
10 mar (high flow valves)
12 mar (tight pipes)
13 mar (plastic density)
15 mar (flipper build)
20 mar (front wheels)
21 mar (tusks on)
...21 mar (buffer tank on)
22 mar (flipper testing)
...22 mar (rear spikes)
29 mar (controller in place)
Feb 2003
11 Feb (Norgren parts)
13 Feb (chassis together)
...13 Feb (pneu. schematic)
28 Feb (ram rear mounting)
Jan 2003
9 jan (lousy drill)
13 jan (drill and bearings)
14 jan (Norgren visit)
22 jan (positioning motors)
...22 jan (axle supports)
24 jan (chassis sides)
Dec 2002
17 dec (shafts finished)
21 dec (flaming resistors)
Nov 2002
1 nov (sprocket shaft)
2 nov (hot regulators)
13 nov (opto pops)
15 nov (Slow fall time)
16 nov (RX interface)
22 nov (RX interference)
29 nov (contactors arrive)
Oct 2002
13 oct (2 bricks working)
14 oct (Bosch order)
...14 oct (flipper calc)
18 oct (Bosch motors arrive)
21 oct (Bosch mods)
26 oct (Motor coupling idea)
29 oct (coupling arrives)
Sep 2002
7 sep (1 brick bolted)
8 sep (1 brick working)
25 sep (pneu diag)
29 sep (brick 2 drilled)
Aug 2002
1 Aug (good sponsors)
...1 Aug (better pneu.)
2 Aug (Norgren reply)
10 Aug (new MOSFET bricks)
24 Aug (appearance money)
31 Aug (metal cut out)
July 2002
20 Jul (improvements)
27 Jul (24v motor test)

Go to Home page

Last updated 17th October 2008